Rain garden, Flood Memorial site near Service Street, Curtin
A new rain garden in the open green space around the Flood Memorial site in Woden will play a role in improving water quality in Yarralumla Creek and add to the commute for the many cyclists who use the nearby bike path every day.
Dry most of the time, a rain garden looks just like a garden on the surface but has a storage and filtration structure underground to reduce the amount of harmful nutrients in stormwater.
Water will be diverted from existing underground stormwater drains, with the treated water returned to Yarralumla Creek which, in turn, flows into the Molonglo River.
During major storm events the maximum water depth will be 30cm. Dense planting will deter people, including children, from entering the water.
Some deciduous trees were removed but have been replaced with evergreen trees to limit autumn leaf drop, which are harmful to our waterways.
A 250m length of existing cycle way has also been widened from 2.5m to 4m as part of this project.
Careful design has ensured that the size of the rain garden is proportionate to the amount of available water during low-flow periods, making it as efficient and cost-effective as possible.
Each year it will remove over 61,000 kilograms of nitrogen, phosphorous and suspended sediment from stormwater run-off.
A two year macrophytes (water quality plants) establishment period has commenced. Establishment period refers to the process by which a plant becomes established in a new habitat.
The establishment period may change depending on ground and weather conditions. During the establishment period, flows into and through the asset will be managed to suit the conditions and to protect and nurture the plants.
Some areas of the site may remain closed to allow for plants to establish.
Design changes
During the final design phase, some changes were made to the original concept designs to avoid the need to relocate an array of underground utilities and services and to limit the removal of established trees.
- The size and configuration of the rain garden evolved to protect the existing Flood Memorial, avoid underground services and protect existing trees.
- Although the total treatment area was reduced by approximately 50 per cent, potential pollutant reduction per square metre increased, making it more efficient and cost-effective.
- An enlarged in-ground Gross Pollutant Trap (GPT) replaced the proposed sediment forbays freeing up space for the rain garden.
- The southern cell was split to avoid the realignment of a stormwater pipe.
- Underground high voltage cables will be relocated.