Stage 2 - Environment, Planning and Sustainable Development Directorate - Environment

We are expanding our infrastructure options in Stage 2 of the Healthy Waterways program by trialling a range of designs that are either new to the ACT or are old designs being used in new situations. The Stage 2 assets are trials of innovative designs that will expand the management options for the ACT Government to draw from in future water quality improvement initiatives.

We examined seven catchments across Canberra for possible sites to trial new asset designs:

These catchments were selected based on recognised water quality problems and demand from stakeholders.

Thirteen asset designs/locations were then chosen based on:

An asset was chosen from each catchment except the Yarralumla catchment, where the sites we examined were less suited to the innovations we are trialling. For an explanation of each asset type, visit the types of infrastructure page.

The assets we are building or hope to build are:

AssetSuburbAddress or LocaleStatus

Bioretention swales

Kambah

Kambah District Playing Fields 1-3

Built, at handover

Floating wetland

Amaroo

Yerrabi Pond

To be deployed by end November

Wetland

Belconnen

Belconnen Oval

Preliminary design

Mini raingarden

Higgins

Bevan St Park near O’Sullivan St.

Preliminary design

Tuggeranong Creek channel naturalisation

Calwell

South of Johnson Drive

Under construction

Reconnect old creek line

Richardson

Tuggeranong Homestead

Preliminary design

Water re-use from water quality pond

Kambah

Kett Street

Preliminary design

Water re-use1

Kambah

Boddington Crescent

Preliminary design

Water re-use

Wanniassa

Hyland Place

Preliminary design

4 small pocket bioretention basins

Fadden

Upper catchment

Preliminary design

Naturalise drain entering Tuggeranong Ck

Isabella Plains

SW of Isabella Drive x Ashley Drive

Detailed design

Bioretention swale and raingarden1

Kambah

Severne Crescent

Reserve

Roadside curb outlets to green space

Kambah

Upper catchment

Under construction

1Reserve asset, to be built if funds allow.