ACT Rural Resilience Grants - 2018-2019 Recipients - Environment, Planning and Sustainable Development Directorate - Environment

ACT Rural Resilience Grants - 2018-2019 Recipients

26 projects were supported under the ACT Rural Resilience Grants in 2018-19.

Projects

Area

Drought proofing a large section of the property by accessing town water for stock water and installing pipes, troughs

Lanyon

Installation of a fodder silo to store drought stock feed

Naas

Installation of a fodder silo to store drought stock feed

Majura Valley

Installation of a tank to provide additional water for livestock as other sources dry up

Urriara

Installation of two stock water tanks to harvest water from an existing shed to improve drought stock water supply

Tharwa

Installation of a solar powered pump to supply farm dams with surface water from Spring Station Creek at times when the dams are low or empty during drought

Tharwa

Construction of a dam to open up paddocks currently without stock water to enable improved access and management of pastures during drought

Tidbinbilla

Installation of pipes, tanks, troughs to extend water to areas of farm where farm dams have dried up

Symonston

Installation of bores, tanks, pipes and troughs to provide areas of the property with stock water, where dams have dried

Point Hut Crossing

Construction of a fodder shed to store more fodder during and prior to drought

Belconnen

Install water supply adjacent to Gudgenby River to provide reliable off-stream stock water as dams dry up

Booth

Fencing to create a drought sacrifice paddock and installation of stock water

Kowen

Installation of an additional tank to supplement stock water during drought

Symonston

Provision of two extra water tanks for stock water to provide greater resilience during drought

Naas

Construction of fodder storage facility to allow storage and improved provision of stock feed during drought

Naas

Construction of a stock water dam and installation of a pipe and trough system to pipe water to areas where dam water has dried up and to take pressure of local streams during drought

Tharwa

Advice and implementation of pest animal control and construction of a farm watering system to reduce overgrazing and improve drought resilience

Jerrabomberra

Construction of a hay shed for drought fodder storage

Naas

Increase stock water storage and distribution around the property to ensure property more resilient to drought

Tuggeranong

Installation of 5km of kangaroo proof fencing to reduce total grazing pressure on pastures during drought

Tidbinbilla

Install two tanks and troughs and pipes to provide additional stock water during drought as dams dry up

Naas

Construction of a hay shed for drought fodder storage to maintain stock and groundcover health during drought

Tharwa

New hay shed to store hay to make the property more drought resilient

Kowen

De-silt existing dried-up farm dam to allow sufficient on-farm water storage in times of future drought

Tidbinbilla

Build a fodder shed to store drought fodder to ensure property more resilient during drought

Naas

Dam repair and desilting of two dams to protect and improve stock water during drought

Majura Valley